(https://monon.org//HVRM/header-background2.jpg)
Monon DS-50 Restoration Work Update
Update by Les Beckman
March 18, 2023
HVRM's Kevin Kennedy sent these two photos of his work priming the floor and sand box wall of DS-50 at North Judson today.
Second coat of primer and then finish coat of black, will be applied.
A wood floor will eventually cover this so it won't be visible, but good to know that the steel has been protected.
(https://monon.org/HVRM/HVRM_3-18-2023/20230318_141321.jpg)
(https://monon.org/HVRM/HVRM_3-18-2023/20230318_141323.jpg)
The Monon projects continue ongoing at Hoosier Valley!
Much more still to do, but we're getting there!